At all stages of Investigation, through design and construction, It is suggested, a pavement team should consist of at least two certified pavement engineers: A Pavement Team Member and Pavement Team Leader. Under certain circumstances, this may be relaxed with the approval of the Overseeing Organisation. The number of pavement team graduates is not restricted. However, the number shall be proportionate to the overall scheme size.
The pavement team structure is detailed in Table 1 below:
Pavement Graduate | Pavement Team Member | Pavement Team Leader | |
---|---|---|---|
Training | Pavement investigation data analysis or road pavement engineering / design training | Hold Pavement Engineer Certification | Hold Pavement Engineer Certification |
CPD | N/A | A minimum of 2 days CPD in the field of pavement design and investigation engineering in the last 12 months | A minimum of 2 days CPD in the field of pavement design and investigation engineering in the last 12 months |
Experience | 1 year of pavement investigation or road pavement design experience | 2 years of pavement investigation, analysis and design experience | 5 years of pavement investigation, analysis and design experience |
N/A | 5 Pavement designs and investigations completed within the last 24 months as team leader, member or graduate | 5 Pavement designs and investigations completed within the last 12 months as team leader, member or graduate |